NEXPERIA BUK9Y19-55B,115
NEXPERIA BUK9Y19-55B,115

NEXPERIA BUK9Y19-55B,115

Manufacturer No:

BUK9Y19-55B,115

Manufacturer:

NEXPERIA

Package:

SC-100, SOT-669

Description:

N-Channel Tape & Reel (TR) 17.3m Ω @ 20A, 10V ±15V 1992pF @ 25V 18nC @ 5V SC-100, SOT-669

Delivery:

DHL
DHL
DHL
DHL

Payment:

DHL
DHL
DHL
DHL
DHL
DHL
DHL

In Stock :Available

Price not displayed? Please send an RFQ, and we will respond immediately.

BUK9Y19-55B,115 information

NEXPERIA BUK9Y19-55B,115 technical specifications, attributes, parameters and parts with similar specifications to NEXPERIA BUK9Y19-55B,115.

  • Type
  • Parameter
  • Factory Lead Time
  • 12 Weeks
  • Contact Plating
  • Tin
  • Mounting Type
  • Surface Mount
  • Package / Case
  • SC-100, SOT-669
  • Surface Mount
  • YES
  • Number of Pins
  • 4
  • Transistor Element Material
  • SILICON
  • Current - Continuous Drain (Id) @ 25℃
  • 46A Tc
  • Drive Voltage (Max Rds On, Min Rds On)
  • 5V
  • Number of Elements
  • 1
  • Power Dissipation (Max)
  • 85W Tc
  • Turn Off Delay Time
  • 44 ns
  • Operating Temperature
  • -55°C~175°C TJ
  • Packaging
  • Tape & Reel (TR)
  • Series
  • Automotive, AEC-Q101, TrenchMOS™
  • Published
  • 2008
  • JESD-609 Code
  • e3
  • Part Status
  • Active
  • Moisture Sensitivity Level (MSL)
  • 1 (Unlimited)
  • Number of Terminations
  • 4
  • ECCN Code
  • EAR99
  • Additional Feature
  • LOGIC LEVEL COMPATIBLE
  • Terminal Position
  • SINGLE
  • Terminal Form
  • GULL WING
  • Time@Peak Reflow Temperature-Max (s)
  • 30
  • Pin Count
  • 4
  • Configuration
  • SINGLE WITH BUILT-IN DIODE
  • Operating Mode
  • ENHANCEMENT MODE
  • Power Dissipation
  • 85W
  • Case Connection
  • DRAIN
  • Turn On Delay Time
  • 18 ns
  • FET Type
  • N-Channel
  • Transistor Application
  • SWITCHING
  • Rds On (Max) @ Id, Vgs
  • 17.3m Ω @ 20A, 10V
  • Vgs(th) (Max) @ Id
  • 2V @ 1mA
  • Input Capacitance (Ciss) (Max) @ Vds
  • 1992pF @ 25V
  • Gate Charge (Qg) (Max) @ Vgs
  • 18nC @ 5V
  • Rise Time
  • 180ns
  • Vgs (Max)
  • ±15V
  • Fall Time (Typ)
  • 134 ns
  • Continuous Drain Current (ID)
  • 46A
  • Gate to Source Voltage (Vgs)
  • 15V
  • Max Dual Supply Voltage
  • 55V
  • Drain to Source Breakdown Voltage
  • 55V
  • Avalanche Energy Rating (Eas)
  • 80 mJ
  • Radiation Hardening
  • No
  • RoHS Status
  • RoHS Compliant

Download datasheets and manufacturer documentation for NEXPERIA BUK9Y19-55B,115.

BUK9Y19-55B,115 Overview


An avalanche break down occurs, and the applied energy is called avalanche energy, with a rating of 80 mJ Avalanche energy.An op amp's input capacitance is defined as the capacitance between both of its input terminals with either input grounded, and 1992pF @ 25V is its maximum input capacitance.The drain current is the maximum continuous current the device can conduct, and this device has 46A continuous drain current (ID).A drainage-to-source breakdown voltage corresponds to the voltage at which a specified value of ID flows, where VGS is 55V, and this device has a drainage-to-source breakdown voltage of 55VV.Before drain current conduction begins, the device's input capacitance must be charged, so the delay time is 18 ns.An FET transistor's gate-source voltage, VGS, indicates how much voltage is applied across the transistor's gate-source terminal and it can range from 15V to 1.In addition to 55V, it supports dual voltages up to the maximum.

BUK9Y19-55B,115 Features


the avalanche energy rating (Eas) is 80 mJ
a continuous drain current (ID) of 46A
a drain-to-source breakdown voltage of 55V voltage


BUK9Y19-55B,115 Applications


There are a lot of Nexperia USA Inc.
BUK9Y19-55B,115 applications of single MOSFETs transistors.


  • AC-DC Power Supply
  • Synchronous Rectification for ATX 1 Server I Telecom PSU
  • Motor drives and Uninterruptible Power Supplies
  • Micro Solar Inverter
  • DC/DC converters
  • Power Tools
  • Motor Drives and Uninterruptible Power Supples
  • Synchronous Rectification
  • Battery Protection Circuit
  • Telecom 1 Sever Power Supplies

User Guide

PURCHASE

Please verify all part numbers, quantities, and packaging preferences before placing your order. If substitutions are acceptable, please indicate this clearly. For time-sensitive projects, confirm estimated delivery dates and stock availability in advance. Once submitted, changes or cancellations may not be possible, especially for items marked as non-cancellable/non-returnable (NCNR). For international shipments, please ensure all import documentation is complete and accurate to avoid delays.

MEANS OF PAYMENT

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and Wire Transfer. Net terms may be available for qualified customers upon approval.

RFQ (REQUEST FOR QUOTATIONS)

Please ensure the part numbers and quantities are accurate and complete when submitting your RFQ.
Provide target prices and acceptable alternatives, if any, to speed up the quotation process.

IMPORTANT NOTICE

Quotations are subject to stock availability and may vary with market conditions. Prices and lead times are not guaranteed until a purchase order is confirmed. Ensure your contact details are correct to avoid delays in response.

Step1:Prepare product

Step1:Prepare product

Step2:Desiccant Protection

Step2:Desiccant Protection

Step3:Vacuum Packaging

Step3:Vacuum Packaging

Step4:Individual Package

Step4:Individual Package

Step5:Anti-collision Filling

Step5:Anti-collision Filling

Step6:Packaging Box

Step6:Packaging Box

SHIPPING COST

1. Shipping starts at $40, but some countries will exceed $40. For example (South Africa, Brazil, India, Pakistan, Israel, etc.).
2. Some specific products need to reach the minimum order quantity.
3. It may cost additional remote fees for delivery if you are in a remote area.

SHIPPING METHOD

Currently, our products are shipped through DHL, FedEx, SF, and UPS.

DELIVERY TIME

1. Once the goods are shipped, estimated delivery time depends on the shipping methods you chose: FedEx International, 5-7 business days.
2. For in-stock parts, orders normally could be shipped out within 1-2days.